(629) 276-6322 Open 24 hours · Mon–Sun FREE camera inspection with any booked job
Blog

Metro Nashville Sewer Permit Requirements Explained (2026)

If you need sewer work done in Nashville or the surrounding counties, a permit is almost certainly part of the picture. Here is what Metro Water Services (MWS) requires, when you need a permit, how the process works, and what happens if you skip it. Updated for 2026.

Overview

Why Sewer Permits Matter in Nashville

A sewer permit is not just a bureaucratic hoop. It exists to protect public health, the municipal sewer system, and your property value. Metro Nashville's sanitary sewer network serves more than 200,000 connections across Davidson County, and every repair or replacement that ties into that system needs to meet code. A permit triggers an inspection, and an inspection creates a documented record that the work was done correctly. That record protects you at resale, with your insurer, and if a warranty claim ever arises.

For a broader look at compliance, inspections, and TDEC standards, see our full Nashville Sewer Compliance Guide.

When permits are required

What Sewer Work Requires a Permit

Not every sewer call needs a permit. Here is where the line falls in Metro Nashville's jurisdiction:

  • Full sewer line replacement — always requires a permit, whether done by traditional excavation or trenchless methods like pipe bursting or CIPP lining.
  • New sewer connections — tapping into the Metro main for new construction or an addition always requires a permit and MWS approval.
  • Major sewer line repairs — structural repairs that alter or replace a section of the lateral (such as sectional point repair, pipe bursting, or relining) typically require a permit.
  • Sewer reroutes or relocations — changing the path of the line requires both a permit and often an updated site plan.
  • Routine drain cleaning or clog clearing — generally does not require a permit, because you are not altering the pipe itself.
  • Camera inspections — diagnostic only and do not require a permit.
The process

How the Nashville Sewer Permit Process Works

The permit process in Davidson County follows a clear sequence. Understanding it upfront prevents delays and surprises on the day of the repair.

  1. Pre-Work Diagnosis

    A licensed contractor runs a sewer camera inspection to identify and document the problem, its location, and the condition of the line. This footage becomes part of the permit application.

  2. Permit Application

    The contractor submits the application to Metro Water Services, including the scope of work, repair method (excavation, CIPP, pipe bursting), site location, and any supporting documentation. MWS reviews and issues the permit before work can begin.

  3. Permitted Work

    Once the permit is approved, the repair or replacement is performed according to the permitted scope. Any deviation from the approved plan may require a permit amendment.

  4. MWS Inspection

    Before the trench is backfilled or the line is returned to service, an MWS inspector verifies the work meets code: correct materials, proper connections, adequate slope, and compliance with TDEC environmental standards.

  5. Sign-Off and Documentation

    The inspector signs off, the permit is closed, and the homeowner receives documentation. This record should be kept permanently for insurance, warranty, and resale purposes.

Timeline: Most residential sewer permits in Davidson County are processed within 3-5 business days. Emergency permits for active backups or sewage exposure may be expedited. The inspection itself is typically scheduled within 24-48 hours of the contractor's request.

County differences

Williamson County vs. Davidson County Permits

Prodigy operates across both Davidson County (Metro Nashville) and Williamson County (Franklin, Brentwood, Spring Hill, Nolensville). The permitting process differs between the two:

Davidson County (Metro Nashville)

Permits are issued through Metro Water Services. MWS manages the sanitary sewer system and handles all inspections for connections, repairs, and replacements within its service boundary. The permit application and inspection request go through MWS directly.

Williamson County

Sewer permitting in Williamson County depends on the utility provider for the specific area. Municipalities like Franklin have their own water and sewer departments that issue permits and run inspections. Properties on septic systems fall under Tennessee TDEC regulations instead of a municipal sewer authority. Your contractor should know which entity has jurisdiction over your address.

Licensed contractors

Why Hiring a Licensed Contractor Matters

Tennessee state law requires a contractor license for plumbing and sewer work, and Metro Nashville requires the contractor pulling the permit to be properly licensed and insured. Here is why that matters to you as a homeowner:

  • Permit responsibility: A licensed contractor pulls the permit in their name, taking legal responsibility for the work meeting code.
  • Inspection coordination: They schedule and manage the MWS inspection so you do not have to navigate the process yourself.
  • Insurance protection: Licensed and insured contractors carry liability coverage. If something goes wrong during the job, you are protected.
  • Warranty validity: Many product and workmanship warranties require installation by a licensed professional. Unlicensed work can void them.
  • Resale protection: A closed permit with a licensed contractor on record gives a buyer's inspector and title company confidence the work was done right.

Prodigy handles it all. We pull every permit, coordinate every inspection, and hand you the closed-permit documentation when the job is done. You never have to visit a permit office or chase down an inspector. Call (629) 276-6322 to get started.

Penalties

Penalties for Unpermitted Sewer Work

Skipping the permit might seem like a shortcut, but the consequences are significant:

  • Stop-work orders: Metro Nashville can issue an immediate stop-work order, halting the job until the situation is resolved and a permit is obtained after the fact.
  • Fines: Municipal fines for unpermitted work can range from several hundred to several thousand dollars, depending on the scope and whether it is a repeat violation.
  • Forced re-excavation: MWS may require the contractor to excavate and expose completed work so it can be inspected after the fact, adding thousands in cost.
  • Resale complications: A title search or buyer's inspection that flags unpermitted sewer work can delay or kill a sale, or force a price reduction.
  • Voided warranties and insurance issues: Manufacturers and insurers can deny claims tied to work that was not permitted and inspected.
  • Environmental liability: If unpermitted work causes a sewage discharge into waterways or groundwater, TDEC can pursue additional state-level penalties.
FAQ

Nashville Sewer Permit Requirements - FAQ

Do I need a permit to repair a sewer line in Nashville?

If the repair alters or replaces any section of the sewer line, yes. Metro Water Services requires a permit for structural repairs such as sectional point repair, pipe bursting, CIPP lining, and full replacements. Simple clog clearing and camera inspections do not require a permit.

Does trenchless sewer repair require a permit in Nashville?

Yes. The permit requirement is triggered by the alteration of the sewer line, not the method used to do the work. Trenchless methods like CIPP lining and pipe bursting go through the same MWS permitting and inspection process as traditional excavation.

How long does it take to get a sewer permit in Davidson County?

Most residential sewer permits are processed within 3-5 business days after the application is submitted to Metro Water Services. Emergency situations involving active backups or sewage exposure may qualify for an expedited permit.

Are sewer permits different in Williamson County vs. Davidson County?

Yes. In Davidson County, Metro Water Services handles permitting and inspections. In Williamson County, the permit authority depends on your location. Cities like Franklin have their own water and sewer departments, while properties on septic systems fall under TDEC oversight. Your contractor should verify which entity has jurisdiction.

What happens if sewer work is done without a permit?

Unpermitted sewer work can result in stop-work orders, municipal fines, forced re-excavation for after-the-fact inspection, resale complications, voided warranties, and potential TDEC environmental penalties if a discharge occurs.

Does Prodigy handle the permit and inspection process?

Yes. Prodigy pulls every required permit, coordinates the MWS or municipal inspection, and provides you with closed-permit documentation when the job is complete. Call (629) 276-6322 and we handle the entire compliance side so you do not have to.

Permits handled for you

Need Permitted Sewer Work in Nashville?

Prodigy pulls the permit, coordinates the inspection, and hands you the documentation. Call or text (629) 276-6322 for a free estimate.

 Call (629) 276-6322
Call Now Specials